Jordan: Transmission Master Plan update for 2020, AREVA/ALSTOM

Update of the transmission master plan (400 kV and 132 kV) for hosting a nuclear power plant of 1000 MW in 2020: load flow study for peak and off-peak, contingency study, short-circuit study, transient stability study and interconnection capacity analysis.

Financing : FASEP (French Funds for studies and assistance to the private sector for export)

2009-2010