Nepal: Transmission Master Plan, AETS-EDF

Team Leader, development of a generation scenario on Excel based on IPP announcements, development of the main transmission and interconnection variants, supervision of the load-flow and N-1 analysis, and costing of the investments.

Financing: World Bank

2014-2015